|
|
ATTIKAT
INFRASTRUCTURE | EYDE/PATHE : CONSTRUCTION OF MOTORWAY AND OTHER ACCOMPANYING WORKS IN THE SECTION : BEGINNING OF THE ROAD JUNCTION OF AGIA MARINA OF STYLIDA – BEGINNING OF THE ROAD JUNCTION OF RACHES ON THE PATHE AXIS |  | Project Categories | INFRASTRUCTUREMotorways-Road ConstructionBridgesTunnels | | Project Owner | HELLENIC MINISTRY FOR THE ENVIRONMENT, PHYSICAL PLANNING & PUBLIC WORKS/PATHE | | Project Location | GREECE - PR. PTHIOTIDA | | Construction Period | 2007 - 2010 | | (%) Company Participation | 100 % | | The project objective is the construction of the PATHE section from the Road Junction of Agia Marina to the Road Junction of Raches, which includes, the artery, of approximate length of 19.2 km, of typical cross-section of 22.65 m, of which 1.2 km is the widening or/and improvement of the tracing of the N.N.H. while the remaining 18.00 km are formed via a new tracing, tree double branch tunnels of total length of 3.00 km (for a single branch) with the two servicing buildings, four dale bridges (three of a double branch and one of a single branch) 1.8 km long in total (for a single branch), three underpass junctions, one bridge, upper and lower crosswalks and side and transverse roads 25 km long in total.
|
| EYDE/PATHE : CONSTRUCTION OF MOTORWAY WORKS AND OTHER ACCOMPANYING WORKS IN THE SECTION : NEW WATERCOURSE OF SPERCHIOS – END OF THE RODITSA MOTORWAY ON THE PATHE AXIS |  | Project Categories | INFRASTRUCTUREMotorways-Road ConstructionBridges | | Project Owner | HELLENIC MINISTRY FOR THE ENVIRONMENT, PHYSICAL PLANNING & PUBLIC WORKS/PATHE | | Project Location | GREECE - PR. PTHIOTIDA | | Construction Period | 2006 - 2009 | | (%) Company Participation | 100 % | | The project objective is the construction of the PATHE section from the New Watercourse of Sperchios to the end of the Roditsa Motorway, which includes, a) the artery, approximately 4.06 m long, as a widening or/and improvement if the tracing of the existing N.N.H., b) the underpass junction of Roditsa (of the “trumpet” type), which serves as a connection of the city of Lamia with the PATHE motorway, c) the side and transverse roads and local roads, d) the rearrangement of the New Watercourse of Sperchios, from its deboutchment to K.P. 5+561 (approximately 250 m uphill to PATHE), The K.P. which is identified with K.P. 5+600 of the hydraulic design, e) the rearrangement of the Lamia ditch from its extrusion in the New Watercourse of Sperchios (K.P. 0+000) to K.P. 5+000, f) The rearrangement of the Xirias torrent section, approximately 660 m long and g) the restoration of the affected works of the irrigation networks Anthili – Roditsa.
|
| EGNATIA ODOS : SECTION PANAGIA – GREVENA, FROM K.P. 6+300 TO K.P. 16+300 (4.1.1.s – 4.1.2.s) |  | Project Categories | INFRASTRUCTUREMotorways-Road ConstructionBridgesTunnels | | Project Owner | EGNATIA ODOS S.A. | | Project Location | GREECE - PR.GREVENON | | Construction Period | 2005 - 2008 | | (%) Company Participation | 100 % | | The project objective is the construction of the Egnatia Road (E.R.) section from Panagia to Grevena in the county of Grevena, 10 km long. This section includes the opening up of the motorway with a typical cross-section of 10.50 m per branch which includes five twin tunnels with maximum length of 785 m and with total length of 5.9 km (for a single branch) and two double bridges 1.7 km long (for a single branch) and with maximum opening of 120 m. |
| EGNATIA : SECTION PANAGIA – GREVENA, FROM THE PANAGIA ROAD JUNCTION TO K.P. 6+300 (4.1.1.S) |  | Project Categories | INFRASTRUCTUREMotorways-Road ConstructionBridgesTunnels | | Project Owner | EGNATIA ODOS SA | | Project Location | GREECE - PR.IOANNINON - PR.GREVENON | | Construction Period | 2005 - 2008 | | (%) Company Participation | 100 % | | This section includes the opening up for the motorway with a typical cross-section of 10.50 m per branch which includes two twin tunnels correspondingly 2.7 km and 1.7 km long and of a total length of 8.4 km (for a single branch), a double bridge 350 m long (700 for a single branch) and with a maximum opening of 160 m, with cantilever structure, as well as the completion of the underpass junction of Panagia which includes an artery 1.3 km long, three branches, a double bridge 200 m long (600 m for a single branch) and two branch bridges.
|
| EYDE/PATHE : CONSTRUCTION OF MOTORWAY WORKS AND OTHER ACCOMPANYING WORKS SECTION SKARFIA (OSE BRIDGE) – BEGINNING OF THE THERMOPYLES MOTORWAY ON THE PATHE AXIS |  | Project Category | INFRASTRUCTUREMotorways-Road Construction | | Project Owner | HELLENIC MINISTRY FOR THE ENVIRONMENT, PHYSICAL PLANNING & PUBLIC WORKS/PATHE | | Project Location | GREECE - PR. FTHIOTIDA | | Construction Period | 2006 - 2008 | | (%) Company Participation | 100 % | | The project objective is the construction of a PATHE section of an approximate total length of 17.400 km. This project includes the construction of the motorway in the section of “Skarfia – Thermopyles” approximately 17.400 km long, the construction of two semi-underpasses (S-U of Skarfia and S-U of Thermopyles) and of one underpass junction (Motorway of Molos) and the restoration of the transverse and side local roads network as well as the creation of side roads wherever required. Also full construction of the road is anticipated i.e. earthmoving, road layering, bitumen works, technical works (large and small), draining – straining, signaling – safety measures, junction, underpass and parking flats electric power supply and lighting, telephone supply infrastructure, irrigation and seeding works and environmental protection works |
| EGNATIA ODOS : DERVENI – SERRES – PROMACHONAS : ROAD JUNCTION OF LEFKONA – ROAD JUNCTION OF CHRISTOS (60.2.2) |  | Project Categories | INFRASTRUCTUREMotorways-Road ConstructionBridges | | Project Owner | EGNATIA ODOS S.A. | | Project Location | GREECE - PR. SERRON | | Construction Period | 2006 - 2008 | | (%) Company Participation | 100 % | | The project objective is the construction of the section Strymoniko – Road Junction of Lefkona – Road Junction of Christos of the Egnatia Roadtransverse link Thessaloniki – Serres – Promachonas, of a total length of 22 km. This section includes the opening up of the motorway with a quadruple footprint which include the Strymonas river bridge and other bridges of a total length of 1.8 km (for a single branch) and with a maximum opening of 44.7 m, lower crosswalks, three underpass junctions of Strymoniko with total length of branches of 1.34 km, of Lefkona with total length of branches of 1.73 km, as well as side and transverse roads of a total length of 25 km |
| URGENT FLOOD PREVENTING WORKS FOR THE PROTECTION OF ATTICA REGIONS WHICH ARE |  | Project Category | INFRASTRUCTURENetworks (sewage networks, water reservoirs, wastewater collectors) | | Project Owner | HELLENIC MINISTRY FOR THE ENVIRONMENT, PHYSICAL PLANNING & PUBLIC WORKS | | Project Location | GREECE - PR. ATTIKI | | Construction Period | 2007 - 2008 | | (%) Company Participation | 100 % | | The project objective is the faster possible improvement of the flood-stricken outflow regions via interventions – improvements and additions to be carried out in the streams of Sarantapotamos, Eschatia, Agia Triada and Acharnon in selected sections needing immediate intervention, so that possible floods that may emanate from the fires on Parnitha during July 2007, may be met in the best possible way
|
| EGNATIA ODOS : SECTIONS A) FROM THE ROAD JUNCTION OF CHRYSOUPOLI TO THE INTERSECTION WITH THE NATIONAL HIGHWAY WEST OF THE NESTOS RIVER AND OF THE NESTOS BRIDGE B) FROM THE EASTERN MOUTH OF THE NESTOS TUNNEL TO THE ROAD JUNCTION OF VALIANOS (14.1.2 – 14.2 |  | Project Categories | INFRASTRUCTUREMotorways-Road ConstructionTunnels | | Project Owner | EGNATIA ODOS S.A. | | Project Location | GREECE - PR.KAVALAS | | Construction Period | 2005 - 2007 | | (%) Company Participation | 100 % | | The project objective is the construction of the Egnatia Road (E.R.) sections from the road junction of Chrysoupoli to the National Highway of Kavala – Alexandroupoli and from the western mouth of the Nestos tunnel to the motorway of Valianos, of a total length of 15.23 km. This section includes the opening up of the motorway with total width of 24.5 m which includes a twin tunnel 310 m long, a vehicle - machinery housing building, upper – lower crosswalks as well as side and transverse roads of a total length of 25 km |
| COMPLETION WORKS OF SECTION FROM JUNCTION IGOUMENITSA'S UP TO JUNCTION SELLON |  | Project Categories | INFRASTRUCTUREMotorways-Road ConstructionTunnels | | Project Owner | EGNATIA ODOS S.A. | | Project Location | Greece - Igoumenitsa (from junction Igoumenitsa's up to junction Sellon) | | Construction Period | 1999 - 2005 | | (%) Company Participation | 30 % | |
Construction of additional works with companion craftworks, sewerage, completion of water supply works, electricity, marking - security additional works, completion lateral roads, etc. |
| ELEFSINA - STAVROS - SPATA A/P MOTORWAY & IMITOS WESTERN PERIPHERAL MOTORWAY |  | Project Categories | INFRASTRUCTUREMotorways-Road ConstructionBridgesTunnelsNetworks (sewage networks, water reservoirs, wastewater collectors) | | Project Owner | Hellenic Ministry for the Environment, Physical Planning and Public Works | | Project Location | Greece - Attica | | Construction Period | 1996 - 2004 | | (%) Company Participation | 8,5856 % | |
A project of vital importance for Attica and Greece which comprises the Design, Construction & Operation of Elefsina - Stavros - Spata A/P Motorway and Imitos Western Peripheral Motorway. Designed according to the most up-to-date specifications as a closed motorway with tolls, which will form the internal peripheral ring road of the wider metropolitical area of the capital city. It consists of two main motorways: ESSM with a length of 50,4 km and IWPM with a length of 12,9 km. |
| CONSTRUCTION OF SAILING OLYMPIC CENTER OF St. KOSMAS - B´ PHASE |  | Project Category | INFRASTRUCTUREPort Projects | | Project Owner | Hellenic Ministry for the Environment, Physical Planning and Public Works/ ÏÅ 2004 | | Project Location | Greece - Attica, St. Kosmas | | Construction Period | 2002 - 2004 | | (%) Company Participation | 60 % | | Marin and land construction of the Sailing Olympic Center in St. Kosmas, for carrying out the pre-Olympig games on August of 2003 and the Olympig games of 2004. |
| OLYMPIC VILLAGE CONSTRUCTION AND POST GAMES ADJUSTMENTS - SECTION C 602 RESIDENTIAL UNITS AND INFRASTRUCTURE |  | Project Category | INFRASTRUCTURENetworks (sewage networks, water reservoirs, wastewater collectors) | | Project Owner | OLYMPIC VILLAGE 2004 S.A. | | Project Location | Greece - Lekanes, Aharnes, Attica | | Construction Period | 2001 - 2003 | | (%) Company Participation | 33,33 % | |
CONSTRUCTION OF 602 RESIDENTIAL UNITS (96 BUILDINGS) AT THE OLYMPIC VILLAGE , IN LEKANES AREA (AHARNES), CONFIGURATION OF SURROUNDING AREA, ROADS AND INFRASTRUCTURE. |
| EGNATIA ROAD: POLYMYLOS - LEFKOPETRA SECTION |  | Project Categories | INFRASTRUCTUREMotorways-Road ConstructionBridgesTunnelsNetworks (sewage networks, water reservoirs, wastewater collectors) | | Project Owner | EGNATIA ODOS SA | | Project Location | Greece - Prefecture of Imathia - Prefecture of Kozani | | Construction Period | 1999 - 2003 | | (%) Company Participation | 8,99 % | |
Project consists of the construction of Polymylos-Lefkopetra section of the Egnatia Highway at the prefectures of Kozani and Imathia, with a total length of 12,9 km. This section includes: a. Highway opening up at the Polymylos-Lefkopetra section (5,1), with a total length of 12,9 km and a typical cross-section of 22,00 m. b. Restoration of the lateral and side road network at the area of Polymylos (Crossing 33). c. Restoration of existing installations of public utility undertakings. d. Construction of bilateral parking opening at km 24+000. Full road construction is provisioned, that is: earthworks, road pavement, asphalt works, (minor and major) technical works, tunnels, sewage, drainage, signage, telephone line, tunnel fire protection, lighting of tunnels and major technical works, hydroseeding. |
| CONSTRUCTION OF SUPPLEMENTARY WORKS OF PATRAS-ATHENS-THESALONIKI-EVZONI (PATHE) MOTORWAY IN THE YLIKI-AG. KONSTANTINOS SECTION |  | Project Categories | INFRASTRUCTUREMotorways-Road ConstructionBridgesNetworks (sewage networks, water reservoirs, wastewater collectors) | | Project Owner | PUBLIC WORKS SERVICE FOR PATHE MOTORWAY (EYDE/PATHE) | | Project Location | Greece - Prefecture of Fthiotida | | Construction Period | 2000 - 2002 | | (%) Company Participation | 100 % | |
Project involves full road construction works, i.e. earthworks, technical works, road pavement, asphalt works, signage, protection equipment, full fencing and electric lighting, according to the provisions of the approved designs, SOS telephone line infrastructure, irrigation and fire fighting infrastructure, storm drainage infrastructure, as well as any additional piping along the roads for installation of cables, which will be done only upon request and according to the guidelines of the department. |
| LAMIA'S GENERAL HOSPITAL. NEW BUILDING GROUP FOR 300 BEDS |  | Project Category | INFRASTRUCTURENetworks (sewage networks, water reservoirs, wastewater collectors) | | Project Owner | Hellenic Ministry for the Environment, Physical Planning and Public Works | | Project Location | Greece - Lamia, Fthiotida's perfecture | | Construction Period | 1997 - 2002 | | (%) Company Participation | 100 % | |
Construction of new building group 300 beds, total building surface 40.185,79m2. The constructing works are : a) building, such as excavations, concrete works, walls, wood works, metal works and cover works, b) Elektromechanical installations, such as water supply, sewerange, elektrical, air conditioning, fire extinction, lightning rod, steam installation, medical gas - gas, c) surrounding works, such as roads, perking, supporting walls, ramps, pavements etc. |
| EXTENSION OF LINE 2: SEPOLIA - THIVON TUNNEL |  | Project Categories | INFRASTRUCTURETunnelsRailway Networks | | Project Owner | ATTIKO METRO SA | | Project Location | Greece - Athens | | Construction Period | 2000 - 2002 | | (%) Company Participation | 33,33 % | |
Project includes pile works, C&C tunnel excavation and tunnel excavation using the NATM method. Furthermore, it includes the pile and construction works of departure shaft using the C&C method, OFS departure section which will be constructed using NATM method, transportation and mounting of the OFS equipment and the construction works of the tunnel with OFS. |
| EGNATIA HIGHWAY: SECTION N. KARVALI - A.K. HRYSOUPOLIS (14.1.1) |  | Project Categories | INFRASTRUCTUREMotorways-Road ConstructionNetworks (sewage networks, water reservoirs, wastewater collectors) | | Project Owner | EGNATIA ODOS SA | | Project Location | Greece - N. KARVALI - A.K. HRYSOYPOLIS | | Construction Period | 1999 - 2002 | | (%) Company Participation | 4 % | |
Construction of Egnatia Highway from km 15+600 to km 16+350, from km 0+000 to km 4+200, from km 8+200 to km 8+400 and from km 9+520 to km 10+700 and of the parallel motorway. |
| ATTICA ROAD. IMITOS WESTERN PERIPHERAL MOTORWAY (IWPM) |  | Project Categories | INFRASTRUCTUREMotorways-Road ConstructionBridgesTunnelsNetworks (sewage networks, water reservoirs, wastewater collectors) | | Project Owner | Hellenic Ministry for the Environment, Physical Planning and Public Works | | Project Location | Greece - Attica | | Construction Period | 1999 - 2002 | | (%) Company Participation | 38 % | |
1) Construction of a motorway with a total length of 6,5 km + 2 km widening of Katehaki avenue with three traffic lanes + wide shoulder per direction.
2) Construction of College tunnel, Dimokritos Interchange tunnel and Dimokritos tunnel with a total length of 1.749m.
3) Construction of CUT & COVER 18 with a total length of 3.180 m. |
| THIRD ROAD RESTORATION CN2 (E85) GH. DOJA-FITIPESTI K.P. 263+000 TO 302+000 |  | Project Categories | INFRASTRUCTUREMotorways-Road ConstructionNetworks (sewage networks, water reservoirs, wastewater collectors) | | Project Owner | National Administration of RoadsMinistry of Transport - Romania | | Project Location | Romania - BACAU | | Construction Period | 1999 - 2002 | | (%) Company Participation | 50 % | |
Reconstruction and restoration of the GH. DOJA-FITIPESTI K.P. highway 263+000 TO 302+000. |
| CONSTRUCTION OF SUPPLEMENTARY WORKS OF PATRAS-ATHENS-THESALONIKI-EVZONI (PATHE) MOTORWAY IN THE SKOTINA-KATERINI SECTION |  | Project Categories | INFRASTRUCTUREMotorways-Road ConstructionBridgesNetworks (sewage networks, water reservoirs, wastewater collectors) | | Project Owner | PUBLIC WORKS SERVICE FOR PATHE MOTORWAY (EYDE/PATHE) | | Project Location | Greece - Prefecture of Pieria | | Construction Period | 2000 - 2002 | | (%) Company Participation | 90 % | |
Project involves full road construction works, i.e. earthworks, technical works, road pavement, asphalt works, signage, protection equipment, full fencing and electric lighting, according to the provisions of the approved designs, SOS telephone line infrastructure, irrigation and fire fighting infrastructure, storm drainage infrastructure, as well as any additional piping along the roads for the installation of cables, which will be done only on request and according to the guidelines of the department. |
| CONSTRUCTION OF CARS PROTECTED BUILDING AT THE REGION OF LARISSA |  | Project Category | INFRASTRUCTURETunnels | | Project Owner | HELLENIC AIR FORCE / PROJECT OFFICE OF AIR FORCE | | Project Location | Greece - Prefecture of Larissa | | Construction Period | 1999 - 2002 | | (%) Company Participation | 23,5 % | |
Design and construction including construction of tunnels and specialised electromechanical works, according to strict specifications, as well as configuration of the surrounding area. |
| SETTLEMENT AND DIVERSION OF SPERHIOS RIVER DOWNSTREAM OF NEW HIGHWAY AND LAMIAS TRENCH FROM KM 0+000 UP TO KM 7+009 |  | Project Category | INFRASTRUCTURENetworks (sewage networks, water reservoirs, wastewater collectors) | | Project Owner | Hellenic Ministry for the Environment, Physical Planning and Public Works - SOLID GREECE AREA | | Project Location | Greece - Sperhios river, Lamia's area, Fthiotida Perfecture | | Construction Period | 1998 - 2002 | | (%) Company Participation | 100 % | |
Settlement and widening of the new channel diversion of Sperhios river from Km 0+000 (intersection with a new channel) up to Km 7+009. |
| MAIN WATER SUPPLY CANAL D1. SECTION POURNARI II - IMARET |  | Project Categories | INFRASTRUCTUREDamsNetworks (sewage networks, water reservoirs, wastewater collectors) | | Project Owner | Hellenic Ministry for the Environment, Physical Planning and Public Works - RECLAMATION CONTACTS COURSE (D7) | | Project Location | Greece - Arta's perfecture, Ipiro's region, section Pournari - Imaret | | Construction Period | 1999 - 2002 | | (%) Company Participation | 25 % | |
Construction of main water supply canal trench D1, with total length nearly 4.063m, to whivh the begining is at project of Hydro-Electerical Station of Pournari II and the conclusion near 400m downstream Imaret's project. The whole project includes the concrete rectangle canal, width b=4,00m and high changeable high walls, all the craftworks of it and also the hydro-mechanical equipment supply and installation (e.x. s flowfence for adjustment of downstream level, water supply regulators etc ). |
| SECTION KEFALOVRISO - AGELOKASTRO. AGRINIO'S DEVIATION |  | Project Categories | INFRASTRUCTUREMotorways-Road ConstructionBridges | | Project Owner | Hellenic Ministry for the Environment, Physical Planning and Public Works | | Project Location | Greece - Kefalovriso - Agelokastro. Etoloakarnania's perfecture | | Construction Period | 1997 - 2002 | | (%) Company Participation | 0,5 % | |
Total construction of road section from Km 0+520 up to Km 13+500 as well as the construction of Halikio and Agelokastro over-pass junctions. Also the connection of the above road section with the existing national road No5 to so as to operate as continuation of the national road No5. |
| KARLA LAKE WATER RESERVOIR AND RELATED WORKS |  | Project Categories | INFRASTRUCTUREDamsNetworks (sewage networks, water reservoirs, wastewater collectors) | | Project Owner | Hellenic Ministry for the Environment, Physical Planning and Public Works | | Project Location | Greece - Prefecture of Magnesia | | Construction Period | 1999 - 2002 | | (%) Company Participation | 87,45 % | |
A water reservoir will be established at the lowest south-eastern part of Karla Lake and cover an area of 42.000.000 sq.m. It will be formed through the construction of two embankments, eastern and western, with a total length of about 13 km. There is also a provision for the construction of water-tightening embankments with a total length of 7.200 m along parts of the northern bank of the water reservoir. In the water reservoir, S3, S4, S6 and S7 collectors will flow as well as streams of the small mountain basins ending up directly into the reservoir. |
| DAM CONSTRUCTION AT SYKIA, ARTA, GREECE |  | Project Categories | INFRASTRUCTUREDamsNetworks (sewage networks, water reservoirs, wastewater collectors) | | Project Owner | Hellenic Ministry for the Environment, Physical Planning and Public Works | | Project Location | Greece - Prefecture of Arta - Area of Sykia | | Construction Period | 1996 - 2001 | | (%) Company Participation | 40 % | Dam construction including all necessary works for excavation, foundation, construction with impervious stratum, filters, fixing materials, protection rip-rap, etc, water diversion and control, construction of protection works (spillway, drainage tunnel, etc), concrete injections, tunnels of concrete injections and access tunnels. |
| SECTION 1.14: IGOUMENITSA-PEDINI, MESOVOUNIO-GRIKAS TUNNELS |  | Project Categories | INFRASTRUCTUREMotorways-Road ConstructionTunnelsNetworks (sewage networks, water reservoirs, wastewater collectors) | | Project Owner | EGNATIA ODOS SA | | Project Location | Greece - Prefecture of Thesprotia | | Construction Period | 1999 - 2001 | | (%) Company Participation | 100 % | |
Project covering a length of 2.035 m, includes construction of the following works: 1. Full construction of the twin tunnels S2 in Mesovounio (435,460 m) and S3 in Grika-Dikorfo (680,640 m) including road pavement, asphalt works and electromechanical installations. 2. Full construction of sections of the road, i.e. road section between the tunnels (approx. 500 m long) and sections at the beginning and at the end of the project (approx. 200 m long each). 3. Construction of electric lighting and signs of the road in a length of 200 m before and after tunnels as well as in the in-between section of the road. |
| CONSTRUCTION OF TUNNELS, EARTHWORKS AND OTHER TECHNICAL WORKS FOR THE NEW DOUBLE ATHENS - THESSALONIKI RAILWAY LINE BETWEEN KM 399+300 AND KM 411+300 (PLATAMONAS-LEPTOKARYA) AND RESTORATION WORKS FOR THE PARALLEL HIGHWAY - SECTION 2A |  | Project Categories | INFRASTRUCTURETunnelsRailway NetworksNetworks (sewage networks, water reservoirs, wastewater collectors) | | Project Owner | ERGOSE SA | | Project Location | Greece - Perfecture of Pieria - Platamonas - Leptokarya | | Construction Period | 1996 - 2001 | | (%) Company Participation | 98 % | |
Construction of a section of the double Athens-Thessaloniki railway line in the area of Platamonas-Leptokarya and of the parallel highway. The tunnel's entrance and exit are constructed with Cut & Cover. Indicative references of works: Railway Line Length= 11,354 m., Tunnel Length=4.222 m., Highway Length =14.560 m, Major Technical Works = 13. |
| NEW DOUBLE RAILWAY LINE FROM ELEFSINA TO KORINTHOS ( TUNNEL CONSTRUCTION, EARTH WORKS AND OTHER CRAFTWORKS) EFTAXIA TO NEW PERAMOS AREA |  | Project Categories | INFRASTRUCTURETunnelsRailway Networks | | Project Owner | ERGOSE S.A. | | Project Location | Greece - ATTIKI'S PERFECTURE EFTAXIA AREA - NEW PERAMOS JUNCTION | | Construction Period | 1996 - 2001 | | (%) Company Participation | 0,22 % | |
Construction of foundation for the new double normal width and high speed railway line from Elefsina to Korinthos at section area Eftaxia - George River-bed, longtitude 6,2 Km. Typical works reference: 1.625m Tunnel. Final opening : 11,00m. Highway (New Highway Athens - Korinthos) overpass craftwork length 75,00m (opening 11,00m). Railway overpass craftwork (opening 10,50m), small craftworks, sewers and supporting walls, escape tunnel length 400m, highway supporting wall built with piles length 72m, tunnel cut & cover length 32m, lateral roads with companion works. |
| CONSTRUCTION OF GOTSE DELCHEV - DRAMA ROAD TO BORDER CONTROL CHECK POINT |  | Project Categories | INFRASTRUCTUREMotorways-Road ConstructionNetworks (sewage networks, water reservoirs, wastewater collectors) | | Project Owner | MINISTRY OF REGIONAL DEVEPO | | Project Location | Greek-Bulgarian borders - Area of Gotse - Delchev | | Construction Period | 2000 - 2000 | | (%) Company Participation | 1 % | |
Construction of Gotse - Delchev Drama road to Border Control Check Point. Restoration Strengthening and Improvement of highway E-79 Dupnitsa- Kulata. |
| EGNATIA HIGHWAY: IGOUMENITSA - PEDINI; CONSTRUCTION OF THE KOUMARIA - AG. ANASTASIA SECTION KM 14+500 TO KM 19+500 |  | Project Categories | INFRASTRUCTUREMotorways-Road ConstructionBridgesTunnelsNetworks (sewage networks, water reservoirs, wastewater collectors) | | Project Owner | EGNATIA ODOS SA | | Project Location | Greece - Perfecture of Ioannina: Koumaria - Ag. Anastasia | | Construction Period | 1995 - 1999 | | (%) Company Participation | 70 % | |
Construction of a section of Egnatia highway with a total length of 5 km with two traffic lanes and hard shoulder per direction and an island with New Jersey - type guard rails. It includes construction of two tunnels with total length of 1.200 m (2 x 400 + 2 x 200). Tunnels' entrances and exits, having a total length of 700 m, are constructed with the Cut & Cover method. |
| ILIKI - AG. KONSTANTINOS HIGHWAY ATALANTI - ARKITSA SECTION (FROM KM 141+010 TO KM 149+020) |  | Project Categories | INFRASTRUCTUREMotorways-Road ConstructionBridgesNetworks (sewage networks, water reservoirs, wastewater collectors) | | Project Owner | Hellenic Ministry for the Environment, Physical Planning and Public Works / Patra-Athesns-Thesaloniki-Evzoni (PATHE) highway | | Project Location | Greece - Prefecture of Fthiotida - Area between Atalanti a | | Construction Period | 1994 - 1999 | | (%) Company Participation | 5 % | |
Full highway construction (widening) with a total length of 8,1 km (from km 141+010 to km 149+020) with all related works, i.e. earthworks, technical works, road pavement, asphalt works, signage, protection, sewage and drainage works, irrigation, lighting, telephone line, etc. |
| ILIKI - AG. KONSTANTINOS HIGHWAY ILIKI - KASTRO SECTION |  | Project Categories | INFRASTRUCTUREMotorways-Road ConstructionBridgesNetworks (sewage networks, water reservoirs, wastewater collectors) | | Project Owner | Hellenic Ministry for the Environment, Physical Planning and Public Works / Patra-Athesns-Thesaloniki-Evzoni (PATHE) highway | | Project Location | Greece - Prefecture of Fthiotida - Area between Iliki and Kastro - Greece | | Construction Period | 1995 - 1999 | | (%) Company Participation | 74 % | |
Full highway construction with a total length of 18,4 km (from km 90+600 to km 109+000) with all related works, i.e. earthworks, technical works, road pavement, asphalt works, signage, protection, sewage and drainage works, irrigation, lighting, telephone line, etc. |
| SKOTINA - KATERINI HIGHWAY. FULL CONSTRUCTION WORKS OF THE HIGHWAY AND RELATED WORKS AT THE LITOCHORO - DIO SECTION FROM KM 9+500 TO 19+000 |  | Project Categories | INFRASTRUCTUREMotorways-Road ConstructionBridgesNetworks (sewage networks, water reservoirs, wastewater collectors) | | Project Owner | Hellenic Ministry for the Environment, Physical Planning and Public Works / Patra-Athesns-Thesaloniki-Evzoni (PATHE) highway | | Project Location | Greece - Prefecture of Pieria - Litochoro - Dio | | Construction Period | 1995 - 1999 | | (%) Company Participation | 87 % | |
Modification of the highway at the Litochoro - Dio section of the national road with full construction of parallel roads and construction of Litochoro interchange and four vertical roads. It consists part of the "Skotina - Katerini" project and extends from km 9+500 to 19+000 with the starting point of the kilometer marking being at the area of Skotina. |
| FULL HIGHWAY CONSTRUCTION AND ALL RELATED WORKS AT LARISSA BY - PASS (EASTERN) FROM km 346+000 to 368+000 - 3rd SECTION |  | Project Categories | INFRASTRUCTUREMotorways-Road ConstructionBridgesNetworks (sewage networks, water reservoirs, wastewater collectors) | | Project Owner | Hellenic Ministry for the Environment, Physical Planning and Public Works / Patra - Athesns - Thesaloniki - Evzoni (PATHE) highway | | Project Location | Greece - Larissa | | Construction Period | 1995 - 1999 | | (%) Company Participation | 50 % | |
Construction with new road-surveying of Larissa Eastern by-pass which will be part of the new, under construction Athens-Thessaloniki highway, with related works (adjacent roads, trancent roads, link roads with any interchanges required etc.). The total length of the new artery is 22 km while the length of the adjacent roads is 44 km. |
| STUDY AND CONSTRUCTION OF BIOLOGICAL REFINING INSTALATIONS AT INOFITA AREA OF SHIMATARI |  | Project Category | INFRASTRUCTURENetworks (sewage networks, water reservoirs, wastewater collectors) | | Project Owner | Association for biological refining of Inofita area of Shimatari | | Project Location | Greece - Inofita, Viotias Perfecture | | Construction Period | 1993 - 1999 | | (%) Company Participation | 50 % | |
Construction of biological refining Installations including waste pre-elaboration, supply measure, manholes and dividors, landslip and ventilation tanks, pump-houses for mud and foam recirculate and turning down etc. |
| CONSTRUCTION OF HIGHWAY SECTIONS IGOUMENITSA - PEDINI |  | Project Categories | INFRASTRUCTUREMotorways-Road ConstructionTunnels | | Project Owner | Hellenic Ministry for the Environment, Physical Planning and Public Works | | Project Location | Greece - St. Nikolaos - Koumaria | | Construction Period | 1995 - 1999 | | (%) Company Participation | 31,5 % | |
Construction of highway with the companion craftworks ( earthworks, small and big craftworks, tunnel construction that are foreseed at the meditation. |
| CONSTRUCTION OF MARINE WORKS AT THE CENTRAL PORT OF PIRAEUS - PHASE A' |  | Project Category | INFRASTRUCTUREPort Projects | | Project Owner | Piraeus Port Authorities SA | | Project Location | Greece - Piraeus | | Construction Period | 1996 - 1999 | | (%) Company Participation | 5 % | |
Construction of Marine Works at the Central Port of Piraeus - Á+B51' Contract phase. |
| CONSTRUCTION OF EFPIRIDON AQUEDUCT |  | Project Category | INFRASTRUCTURENetworks (sewage networks, water reservoirs, wastewater collectors) | | Project Owner | Athens Water Supply and Sewerage Company (EYDAP) | | Project Location | Greece - Attica | | Construction Period | 1996 - 1999 | | (%) Company Participation | 49 % | |
Construction of an aqueduct with all necessary works, i.e. earthworks, shoring, open and closed concrete pipes. |
| SETTLEMENT, DEEPENING AND SUPPLEMENTARY, TECHNICAL WORKS OF MIDLE AND DOWN FLOW OF VIOTIKOS KIFISSOS |  | Project Category | INFRASTRUCTURENetworks (sewage networks, water reservoirs, wastewater collectors) | | Project Owner | Hellenic Ministry for the Environment, Physical Planning and Public Works | | Project Location | Greece - Viotikos Kifissos, Viotias prefecture | | Construction Period | 1994 - 1998 | | (%) Company Participation | 100 % | |
Total intervention at Viotikos Kifissos, at the midle flow from flowfence BOOT up to KM 13+600 also at the down flow from flowfence BOOT up to the concentrated canal. Specialy, works takes place at craftwork possitions, so that the concrete works be done under dry conditions, constructions for the safety of excavation sloping and widening of cutting of Viotikos Kifissos, drainpipes construction, dethronement of old stone coating and stonebuilt, steps construction, craftworks, etc. |
| ILIKI - ST. KONSTANTINOS. SECTION KASTRO - MARTINO |  | Project Categories | INFRASTRUCTUREMotorways-Road ConstructionBridges | | Project Owner | Hellenic Ministry for the Environment, Physical Planning and Public Works | | Project Location | Greece - Kastro - Martino Viotia's Perfecture | | Construction Period | 1995 - 1998 | | (%) Company Participation | 30 % | |
Construction of highway with companion works (Martino's overpass Junction, lateral roads, cross roads with any overpass intersections, sewerage and drainage works, marking - securement etc. |
| URGENT WORKS FOR THE REMOVAL OF EARTH DISPLACEMENT AT THE SECTION MARKOPOULOU JUNCTION - OINOFYTA JUNCTION FROM KM 18+650 TO KM 18+850 ON THE ATHENS - LAMIA HIGHWAY |  | Project Categories | INFRASTRUCTUREMotorways-Road ConstructionNetworks (sewage networks, water reservoirs, wastewater collectors) | | Project Owner | Hellenic Ministry for the Environment, Physical Planning and Public Works | | Project Location | Greece - Oinofyta | | Construction Period | 1994 - 1996 | | (%) Company Participation | 100 % | |
Full construction of works for removal of earth dispacement (earthworks, technical works, drainage works, etc). |
| AT-GRADE INTERSECTION OF ACHARNON AVENUE WITH ATHENS-LAMIA NATIONAL HIGHWAY |  | Project Categories | INFRASTRUCTUREMotorways-Road ConstructionBridges | | Project Owner | Hellenic Ministry for the Environment, Physical Planning and Public Works | | Project Location | Greece - Acharnai, Prefecture of Attica | | Construction Period | 1994 - 1995 | | (%) Company Participation | 100 % | |
Construction of an at-grade intersection with all related road construction works and construction of a bridge at a curve of 160m with 5 openings (2x26,00 m + 3x36,00 m) with the Freco pre-stress system. |
| CONSTRUCTION OF SECTIONS OF ATHENS - KATERINI MOTORWAY. SECTION 3, SCHIMATARI - RITSONA JUNCTION AND THIVON JUNCTION - YLIKI |  | Project Categories | INFRASTRUCTUREMotorways-Road ConstructionBridges | | Project Owner | Hellenic Ministry for the Environment, Physical Planning and Public Works | | Project Location | Greece - Thiva | | Construction Period | 1991 - 1995 | | (%) Company Participation | 100 % | |
Construction of motorway with all related works (secondary roads, intersections, service roads, road pavement, asphalt works, signage - protection, sewage, drainage, etc). |
| DESIGN AND BUILDING OF INFRASTRUCTURE WORKS IN THE TEMPRORARY HOUSING AREA OF EARTHQUAKE VICTIMS IN AIGIO |  | Project Category | INFRASTRUCTURENetworks (sewage networks, water reservoirs, wastewater collectors) | | Project Owner | Hellenic Ministry for the Environment, Physical Planning and Public Works | | Project Location | Greece - Aigio | | Construction Period | 1995 - 1995 | | (%) Company Participation | 100 % | |
Drawing up of the final project study, configuration of the ground where housings will be installed, construction of water supply and sewage networks, construction of concrete bases for the installation of the housings, connections with the networks of water supply, sewage and PPC and configuration of the access roads. |
| INTAKE OF IRRIGATION NETWORK KARPEROU - DIMITRAS IN GREVENA PREFECTURE |  | Project Categories | INFRASTRUCTUREDamsNetworks (sewage networks, water reservoirs, wastewater collectors) | | Project Owner | Ministry of Agriculture | | Project Location | Greece - Prefecture of Grevena | | Construction Period | 1992 - 1995 | | (%) Company Participation | 100 % | |
Construction of an intake dam in Aliakmonas river. The project includes construction of a canal 5 m wide for the purification of incoming material, the construction of the pump station, the installation of delivery pipe F1000, 4.060 m long, as well as the installation of a canal for the water transportation to the re-calibration tank of irrigation networks. |
| BUILDINGS OF OPERATIONAL FACILITIES OF THE AIR COMMAND IN SKYROS |  | Project Category | INFRASTRUCTURENetworks (sewage networks, water reservoirs, wastewater collectors) | | Project Owner | Hellenic Air Force / Ministry of Defence | | Project Location | Greece - Island of Skyros | | Construction Period | 1993 - 1995 | | (%) Company Participation | 76 % | |
Construction of special buildings of operational facilities of the Air Command along with service installations and constructions. |
| COMPLETION WORKS OF ITEA DETOUR AND ELECTRIC LIGHTING OF ITS JUNCTIONS |  | Project Category | INFRASTRUCTUREMotorways-Road Construction | | Project Owner | Hellenic Ministry for the Environment, Physical Planning and Public Works | | Project Location | Greece - Itea, Prefecture of Amfissa | | Construction Period | 1994 - 1995 | | (%) Company Participation | 100 % | |
Construction of earthworks, technical works, road pavement and asphalt works, as well as construction and electric lighting of the junctions, for the completion of Itea detour. |
| ATHENS - CORINTHOS HIGHWAY ( Kakia Skala Section ) |  | Project Categories | INFRASTRUCTUREMotorways-Road ConstructionBridgesNetworks (sewage networks, water reservoirs, wastewater collectors) | | Project Owner | Hellenic Ministry for the Environment, Physical Planning and Public Works | | Project Location | Greece - Megara - Kakia Skala | | Construction Period | 1992 - 1994 | | (%) Company Participation | 100 % | |
Construction of the MEGARA - KAKIA SKALA section of the ATHENS - CORINTHOS highway (km 43+600 to km 47+000). |
| EVZONOI - ATHENS ROAD NETWORK. Makrygialos - Katerini Section (km 54+365 to km 59+000) |  | Project Categories | INFRASTRUCTUREMotorways-Road ConstructionBridgesNetworks (sewage networks, water reservoirs, wastewater collectors) | | Project Owner | Hellenic Ministry for the Environment, Physical Planning and Public Works | | Project Location | Greece - Makrygialos - Katerini | | Construction Period | 1992 - 1994 | | (%) Company Participation | 100 % | |
Construction of the Makrygialos - Katerini section of the Efzonoi - Athens highway (km 54+365 to km 59+000). |
| EVZONOI - ATHENS ROAD NETWORK. Makrygialos - Katerini Section (km 59+000 to km 63+500) |  | Project Categories | INFRASTRUCTUREMotorways-Road ConstructionBridgesNetworks (sewage networks, water reservoirs, wastewater collectors) | | Project Owner | Hellenic Ministry for the Environment, Physical Planning and Public Works | | Project Location | Greece - Makrygialos - Katerini | | Construction Period | 1992 - 1994 | | (%) Company Participation | 100 % | |
Construction of a section of the Efzonoi-Athens highway section Makrygialos - Katerini from km 59+000 to km 63+500. |
| NEMEA - TRIPOLI HIGHWAY. Velanidia - Artemisio Section |  | Project Categories | INFRASTRUCTUREMotorways-Road ConstructionBridgesNetworks (sewage networks, water reservoirs, wastewater collectors) | | Project Owner | Hellenic Ministry for the Environment, Physical Planning and Public Works | | Project Location | Greece - Velanidia - Artemisio | | Construction Period | 1985 - 1994 | | (%) Company Participation | 98,5 % | |
Construction of the Velanidia - Artemisio section of Nemea - Tripoli highway. |
| ATHENS - CORINTHOS HIGHWAY. Kineta - Ag. Theodoroi Section |  | Project Categories | INFRASTRUCTUREMotorways-Road ConstructionBridgesNetworks (sewage networks, water reservoirs, wastewater collectors) | | Project Owner | Hellenic Ministry for the Environment, Physical Planning and Public Works | | Project Location | Greece - Kineta | | Construction Period | 1991 - 1994 | | (%) Company Participation | 49,5 % | |
Construction of the Kineta - Ag. Theodoroi section (58+511 to 62+026) of ATHENS - CORINTHOS highway. |
| CONSTRUCTION OF SECTIONS OF ATHENS - KATERINI MOTORWAY. SECTION 2 MARKOPOULO JUNCTION - OINOFYTA JUNCTION |  | Project Categories | INFRASTRUCTUREMotorways-Road ConstructionBridges | | Project Owner | Hellenic Ministry for the Environment, Physical Planning and Public Works | | Project Location | Greece - Oinofyta | | Construction Period | 1990 - 1994 | | (%) Company Participation | 100 % | |
Construction of motorway with all related works (secondary roads, intersections, service roads, road pavement, asphalt works, signage - protection, sewage, drainage, etc). |
| SEWERAGE OF THE CITY OF LARISSA - 12/91 DISTRICT CONTAINERS |  | Project Category | INFRASTRUCTURENetworks (sewage networks, water reservoirs, wastewater collectors) | | Project Owner | Larissa Water Supply and Sewerage Company (DEYAL) | | Project Location | Greece - Larissa | | Construction Period | 1992 - 1994 | | (%) Company Participation | 100 % | |
Sewerage System in districts of the city of Larissa. |
| SEWAREGE OF THE CITY OF LARISSA 3/91, DISTRICT STORM WATER RUNOFF AND SEWAGE PIPES |  | Project Category | INFRASTRUCTURENetworks (sewage networks, water reservoirs, wastewater collectors) | | Project Owner | Larissa Water Supply and Sewerage Company (DEYAL) | | Project Location | Greece - Larissa | | Construction Period | 1992 - 1994 | | (%) Company Participation | 100 % | |
Sewerage systems in districts of the city of Larissa. |
| CONSTRUCTION OF PUBLIC UTILITY SYSTEMS AT |  | Project Category | INFRASTRUCTURENetworks (sewage networks, water reservoirs, wastewater collectors) | | Project Owner | Kissos | | Project Location | Greece - KISSOS Built-up area at Hortiatis, Thessaloniki | | Construction Period | 1992 - 1994 | | (%) Company Participation | 100 % | |
Public utility system construction, kerb construction - road pavement of Kissos built-up area roads at Hortiatis, Thessaloniki. |
| IMPROVEMENT OF IRRIGATION IN NEA KERDYLIA, SERRES |  | Project Category | INFRASTRUCTURENetworks (sewage networks, water reservoirs, wastewater collectors) | | Project Owner | Ministry of Agriculture | | Project Location | Greece - Nea Kerdylia, Prefecture of Serres | | Construction Period | 1992 - 1994 | | (%) Company Participation | 100 % | |
Construction of a pumping-station which will be fed by Strymonas river through a canal of trapeoid cross-section, constuction of a pipe water-supply network, construction of tank, and electrical installations. |
| IMPROVEMENT OF THE ROAD STENI - STROPONES - METOXI IN SOUTHERN EUBOEA |  | Project Category | INFRASTRUCTUREMotorways-Road Construction | | Project Owner | Hellenic Ministry for the Environment, Physical Planning and Public Works | | Project Location | Greece - Prefecture of Euboea | | Construction Period | 1989 - 1992 | | (%) Company Participation | 100 % | |
The construction of Stropones detour (earthworks, technical works, asphalt works, etc) is part of this improvement project. |
| NEMEA - TRIPOLI MOTORWAY. SECTION: ARTEMISIO TUNNEL EXIT (KM 0+00) - TRIPOLI (KM 18+340) |  | Project Categories | INFRASTRUCTUREMotorways-Road ConstructionBridges | | Project Owner | Hellenic Ministry for the Environment, Physical Planning and Public Works | | Project Location | Greece - Artemisio - Tripoli | | Construction Period | 1986 - 1992 | | (%) Company Participation | 14,25 % | |
Construction of a motorway section from the exit of Artemisio tunnel to Tripoli. Project including at-grade crossings, junctions, irrigation networks, electric lighting and telephone connections. |
| CONSTRUCTION OF SECTIONS OF ATHENS - KATERINI MOTORWAY. SECTION 1 OINOFYTA JUNCTION - SCHIMATARI JUNCTION |  | Project Categories | INFRASTRUCTUREMotorways-Road ConstructionBridges | | Project Owner | Hellenic Ministry for the Environment, Physical Planning and Public Works | | Project Location | Greece - Oinofyta - Schimatari | | Construction Period | 1985 - 1992 | | (%) Company Participation | 100 % | |
Contsruction of earthworks, technical works, road pavement, asphalt works, signage for the improvement of Athens - Schimatari motorway from Oinofyta junction to Schimatari junction. |
|